We believe that the commissioning phase can be the most important stage of any Air Conditioning or Refrigeration system lifecycle. Why? Because, if a system isn’t commissioned correctly from the onset, it can lead to early breakdown and component failure. Not to mention poor system efficiency. That’s why it’s important to be thorough and ensure the unit is working as it was originally designed.
Here is a list of some of the systems that we commission
• Provisions Refrigeration Systems
• Control Room Packaged Air Conditioning Units
• Living Quarters Air Handling Units
• Hazardous Area Ventilation Systems
• PLC Automatic Control Systems
• Toilet Exhaust Fans
• Fire Damper Testing
• Chilled And Heating Water Systems
• Chiller Units
• Air And Water Balancing
• Control Valves And Safety Circuits
Commissioning of the HVAC systems for an Offshore Platform or Marine Vessel, can be quite a challenge. Our highly experienced Commissioning Engineers are trained and ready to help you get your HVAC systems operating correctly. Whether it’s in the shipyard or offshore, we can help you with your commissioning requirements.
|